East Riding Community Hospital, Swinemoor Lane, Beverley, HU17 0FA.
We supplied over 4000m3 of concrete between 2010 and 2012.
Reinforced floor slabs – C28/35 CIIB-V CONCRETE + PUMP DESIGN.
External car parks – C32/40 CIIB-V CONCRETE + PUMP DESIGN.
Drainage and kerbing, lean mix – GEN3 CIIB-V CONCRETE.
Concrete was supplied as and when required on a daily basis throughout the entire build.
Sandsfield were happy to meet the exacting requirements from the client in supplying small, large and multiple loads.
We also supplied skips for various waste throughout the duration of this project.